Advertisement
The sand in the district will used locally. It will be used for the construction of homes for the poor, construction of buildings under various government works and importance will be given for the construction of houses. The sand problem will be solved soon, he informed.
Sand mining to begin soon
There is no need to conduct a re-survey of the already identified sand blocs in the district. Two people have been given the permission for sand extraction within non-CRZ limits. In the same way, opportunity will be provided for sand mining within CRZ limits without any legal interference. There enough sand still remaining at Baje water reservoir. Therefore immediate action will be taken to start dredging here, he assured.
Related Articles
Advertisement
When I was the COO of Kola ZP, I was conducting phone-in programme once in a month to analyse the problems there and find solutions for them. I am thinking of continuing that in Udupi district as well.
The preparations required for them will be carried out and soon the phone-in programme will be started. Traffic density is increasing in Udupi and Manipal. In this backdrop, discussions will be held with the transport minister and action will be taken, informed the DC