Advertisement
Railway officials said the real-time alert was sent from the hot axle box detector at the Chunar station.
Related Articles
Advertisement
“The train was stopped at the next station, Jigna, and the coach was detached from the train after moving passengers in other coaches,” he said and added that when the Seemanchal Express reached Prayagraj, a new coach was attached.
Officials said the train was delayed by five hours.
“At several points on the railway track, a device known as hot axle box detector is installed. It measures the temperature of axle and provides an alert. The device fitted at the Chunar station provided a timely alert and corrective action was taken,” Chand Mohammed, National Working President, All India Railway Track Maintainers Union, said.