Advertisement
In connection to the sea erosion at Ullal, the work on permanent relief has already been completed. However, since the area from Kaiko to sea ground has variations, the retaining wall needs to be constructed first post which the stones will have to be laid. The work will be carried out post a study by experts, said Mr Khader.
Councilors Mohammed Mukkhacheri, Abdul Basheer, Ravichandra Gatti, Jabbar, K P Abdul Khader, TP member Jabbar Boliyar, Kinya GP vice president Siraj Kinya, Ramachari Mogaveerpattana, Kileriya Masjid president Khaleel and Kaiko Masjid president Abdul Latif were present.