Advertisement
President Droupadi Murmu will inaugurate the state-of-the-art ICMF, set up over an area of 4,500 square metres housing over 70 hi-tech equipment and testing facilities for manufacturing cryogenic (CE20) and semi-cryogenic (SE2000) engines of Indian rockets, on Tuesday.
In 2013, an MOU was signed with ISRO for establishing the facility for manufacturing cryogenic engine modules at HAL, Aerospace Division, and it was subsequently amended in 2016 for setting up of ICMF with an investment of Rs 208 crore.
The commissioning of all the critical equipment for the manufacturing and assembly requirement has been completed, Bengaluru-headquartered HAL said on Monday, adding that the pre-production activities which involve preparation of the process and quality plans, and drawings, have also commenced.
Related Articles
Advertisement
HAL Aerospace Division manufactures liquid propellant tanks and launches vehicle structures of Polar Satellite Launch Vehicle (PSLV), Geosynchronous Satellite Launch Vehicle (GSLV MK-II), GSLV Mk-III, and also stage integration for GSLV Mk-II.
“The facility (ICMF) will cater to the entire Rocket Engine Manufacturing under one roof for ISRO. The facility will boost self-reliance in manufacturing of Hi-thrust Rocket engines,” the HAL statement said.