Advertisement
Earlier the record was held by the Unit 2 of Heysham of the United Kingdom, which operated non-stop for 940 days. On Monday, Unit 1 of Kaiga will surpass that record to set a new one and it will continue to generate power till December 30, and on December 30 Unit 1 of Kaiga will be shut down for maintenance, informed sources.
It may be recalled that on October 24, KAPS had become the first-ever plant in the Heavy Pressurised Water category to have generated power continuously for 894 days. Previously a unit of Pickering Nuclear Generating Station (PNGS) had held this record.
Located 56 km from Karwar, the Kaiga plant has four units. Each unit generates 220 MW power. The power generated is supplied to Karnataka, Andhra Pradesh and Telangana. Four months ago, the same unit of Kaiga had set a national record for continuous operation of 766 days.
Related Articles
Advertisement