Advertisement
The swimming pool was closed for maintenance on August 16, as part of its annual upkeep routine. During this period, access to the pool was restricted to the public and athletes. The repair work included sealing water leaks, replacing broken tiles, and installing interlocking systems around the pool.
Heavy rains during the maintenance period caused delays, especially in water refilling and tile installation, which pushed back the timeline of the project. The pool, measuring 50 meters in length and 15 meters in width, with a depth ranging from 4 to 16 feet, is located near Ladyhill and has been in operation for nearly three decades.
Popular Facility for Swimmers
Related Articles
Advertisement
With the repair work now complete and the final steps underway, the pool is expected to resume operations soon, much to the relief of regular swimmers and trainees.