Advertisement
According to an MCC statement, the water supply to the city will be completely stopped for 48 hours, from 6 am on April 27 to 6 am on April 29.
The technical works include the repair of a 1,200 mm diameter pipe at HLPS 2-80 MLD pumping station and the replacement of the header of LLPS-1 pump number-2, among other ancillary works.
The MCC has urged the public to cooperate during the water supply disruption.