Advertisement
During the visit, he actively listened to public grievances and suggested remedial actions to Abdullah Javed Azmi, Project Director of the National Highway Authority.
The inspection commenced in the morning with a thorough review of complaints raised by farmers’ unions and the general public along the BC road – Gundya route. Mullai Muhilan, accompanied by officials, examined the progress of highway works at various points including Brahmashree Narayan Guru Circle on BC Road, Melkar, Kalladka, Mani, and Uppinangadi.
#gallery-1 {
margin: auto;
}
#gallery-1 .gallery-item {
float: left;
margin-top: 10px;
text-align: center;
width: 100%;
}
#gallery-1 img {
border: 2px solid #cfcfcf;
}
#gallery-1 .gallery-caption {
margin-left: 0;
}
/* see gallery_shortcode() in wp-includes/media.php */
Related Articles
Advertisement
The DC also highlighted instances of drinking water pipes being damaged during road works, causing inconvenience to the residents. He proposed the installation of new pipelines in affected areas to ensure uninterrupted access to clean drinking water.